NFPA 70B Certified Contractor|FAA Part 107 Licensed Drone Pilots
Macro solar panel surface

SolarLink

The irradiance engine for your solar asset.

SolarLink watches every inverter against what it should be producing — that's the alert. Here's what happens next.

Get SolarLink

Producing vs. performing

Your system is producing. Is it producing what it should?

Most monitoring shows bars going up and down. That tells you the panels work. It doesn't tell you whether they're working at rate. Turn on the expected line to see what SolarLink sees.

05k10k15kkWh per monthJanFebMarAprMayJunJulAugSepOctNovJan: 2,508 kWh measuredFeb: 5,390 kWh measuredMar: 3,614 kWh measuredApr: 1,300 kWh measuredMay: 3,800 kWh measuredJun: 3,650 kWh measuredJul: 2,500 kWh measuredAug: 1,450 kWh measuredSep: 350 kWh measuredOct: 2,300 kWh measuredMeasured

This is what most owners see: production every month. Looks fine, right?

Measured
26,862 kWh
Should have made
111,577 kWh
Gap
-75.9%
Lost energy value
$10,166

Inverter B · 113 kWp · Jan–Oct. Real readings from two commercial inverters, names removed. Expected production is calculated from satellite irradiance, connected capacity, tilt and orientation, so a cloudy month lowers the line too. April–October values for Inverter B are read from the chart and are approximate.

Inspections

Get ahead of the curve — don't ride it.

36% better

Sites inspected quarterly showed a 36% improvement over sites inspected once a year.

Source: Raptor Maps Global Solar Report 2026 (2025 data)

79% missed

Thermal imaging alone misses most risky connector and fuse problems: 79% of high-risk connector and fuse issues show no detectable heat signature.

Source: kWh Analytics Solar Risk Assessment 2026

50–70%

Inverters cause roughly half to 70% of O&M failure events and are typically budgeted for replacement around years 10–12.

Source: NREL; Kiwa; E3 (2025)

~48% of losses

In 2025, string and combiner faults caused about 48% of lost production across U.S. sites (average loss 5.08%, about $5,070 per MW).

Source: Raptor Maps 2026

How we inspect

1

Review your SolarLink data first — trends, faults, string and combiner currents, your site's risk factors.

2

Thermal scan under load — strong sun (600 W/m² or more), low wind, right angle, reflections checked.

3

Hands-on checks thermal can't see — connector brand-match audit, pull tests, torque checks at combiners, fuses and inverters, insulation-resistance testing, I-V curve tracing on suspect strings.

4

Inverter health — fault and derate history, fans and filters, temperatures, firmware, and whether the maker still supports it.

5

Site and civil — drainage, erosion, vegetation shading, racking and roof.

6

A report with payback on every item — fix now, fix soon, wait and watch, or replace.

Quarterly or annual? Your site's performance decides.

Quarterly if any apply

  • Production 3%+ below expected last quarter or repeated inverter faults
  • Inverters older than 8 years or from a maker that no longer supports them
  • Mixed-brand connectors or ground-fault history
  • Built in 2020 or no commissioning records
  • Ballasted rooftop; hail or heavy-snow exposure
  • A safety finding in the last 12 months

Annual if

  • The site is healthy and well documented, with none of the above
  • SolarLink keeps watching in between

Four clean quarters and you move to annual. A new warning sign and you move to quarterly.

How SolarLink works

Not a fixed estimate. A live benchmark.

Most monitoring tells you what your system produced last month. SolarLink tells you what it should be producing this hour — then measures the gap. Toggle the conditions below and watch the Delta calculate itself.

Live irradiance

Real-time solar irradiance data benchmarked against your system's rated capacity and orientation.

Delta calculation

The gap between theoretical and actual output, condition-adjusted so weather never reads as a fault.

Action, not alerts

Underperformance triggers dispatch. Overperformance is confirmed. You get the SolarLink Report, not a dashboard to babysit.

SolarCare

SolarLink Performance Report

Sample Commercial Solar Site · Monthly summary · 1,000 kW DC

Clear Sky
Theoretical output
100,000kWh
Actual output
98,500kWh
Delta vs theoretical
-1.5%condition-adjusted
$ lost per day (at $0.12/kWh)
$6
Alerts raised / resolved
12 / 12this period

Output tracking theoretical within tolerance — the benchmark every other condition is judged against.

Showing: Whole site
Theoretical Actual
6h7h8h9h10h11h12h13h14h15h16h17h18h
Array blueprintClear Sky
ST-01ST-02ST-03ST-04ST-05ST-06ST-07ST-08ST-09ST-10ST-11ST-12N
Showing: whole site
FenceTree lineAccess roadEquipment padCombiner box

Click any tracker row to chart it — or an inverter chip to light up its strings across the site.

What to do — Nothing to do — this is the baseline. SolarLink keeps watching every inverter against live irradiance.

01

What SolarLink flagged — and what it means

Alerts & issues

AreaWhat we foundSeverityStatus
Combiner zones A1–A6Output tracking theoretical within toleranceNoneMonitoring
Inverters INV-01 – INV-06All within spec — no faults loggedNoneMonitoring
02

Dispatched, completed, verified

Work performed

WorkDetailOutcome
—No work performed this period — every zone within spec—
03

What we advise before the next report

Recommendations

  • Schedule the next drone IR thermography scan before peak summer irradiance.
  • Review inverter warranty end dates now — replacements are cheapest before failures, not after.
  • Keep the dispatch trigger armed at your chosen threshold — no dispatch happens without it paying back.
04

Where this goes from here

Next steps

Every SolarLink site gets this report monthly, plus an annual summary. When the numbers say a truck roll pays for itself, we dispatch — and you approve the fix and the amount first. Want one for your site?

Apply for a Quote
SolarCare Teaminfo@solarcaremaintenance.com(201) 779-0656solarcaremaintenance.com

Sample — the inverter wall in your portal

Sample Inverter Readings

Exactly the inverter wall and detailed readings a customer sees in the SolarLink portal — same cards, status chips, % of expected and peer comparison, sparklines, and labels. Pick a condition to see how a healthy site reads versus soiling or a fault.

Sample — what you'll see in your SolarLink portal
Condition

Inverter monitors

6 inverters · 6 normal

INV-01

100 kW

% of expected

98%

79.1 kW644 V126.6 A41°C

Running normally — 98% of expected this week.

Today 466 kWh · Lost $1.20

INV-02

100 kW

% of expected

98%

77 kW632 V125.6 A40°C

Running normally — 98% of expected this week.

Today 470 kWh · Lost $1.44

INV-03

100 kW

% of expected

98%

82.6 kW639 V133.3 A40°C

Running normally — 98% of expected this week.

Today 478 kWh · Lost $1.20

INV-04

100 kW

% of expected

97%

80.5 kW628 V132.1 A40°C

Running normally — 97% of expected this week.

Today 480 kWh · Lost $1.68

INV-05

100 kW

% of expected

99%

78.2 kW641 V125.8 A40°C

Running normally — 98% of expected this week.

Today 493 kWh · Lost $0.84

INV-06

100 kW

% of expected

98%

84.1 kW633 V137 A41°C

Running normally — 97% of expected this week.

Today 495 kWh · Lost $1.32

Detailed readings — INV-01

Producing
kWh today
466 / 476
% of expected
98%
Peak kW
79.1
DC voltage
644 V
DC current
126.6 A
Temperature
41°C

14,582 kWh produced of 14,838 expected· 98%

INV-01 — last 30 days (kWh)

Produced Expected
Oct 7Oct 9Oct 11Oct 14Oct 17Oct 20Oct 23Oct 26Oct 29Nov 1Nov 3Nov 5400440480550

Running normally — 98% of expected this week.

Illustrative data for a sample six-inverter site — no login required and no live monitoring data is read. In your portal, these same cards show your own inverters.

Customer portal preview

What you'll see in your SolarLink portal

The customer-side view — site overview, alerts, what it's costing you per day, dispatch approvals and your report archive. Sample data, styled exactly as a SolarLink customer sees it.

Sample data

Action needed

Something is costing you production — review the findings below.

Ask SolarCare
Site: Brookfield Logistics CenterYesterday: 3,412 kWh vs 91% of expectedLast data: Oct 12, 7:00 AM

91%

Energy vs expected this month

86,400 of 94,900 kWh

89%

Performance ratio

last 30 days

96%

Availability

last 30 days

6,930 kWh

Uncaptured production this month

about $832 at $0.12/kWh

712,450 kWh

Year-to-date

vs 760,000 expected · 94%

Alerts & findings

What SolarLink flagged, in plain language — with what it's costing you.

Action neededFix approved — scheduling

Inverter INV-05 tripping offline mid-day

INV-05 trips at ~11 am on hot days and resets by afternoon. Every trip day loses about 340 kWh — $41 at your $0.12/kWh rate.

$41 a daywhile it sitsDispatch now
WatchWatching this

Vegetation shading the western strings

The west-edge tree shades ST-01 after 2 pm and grows through the season — a trim lifts the dip.

$12 a daywhile it sitsWait or bundle

What it's costing you right now

$41 per day

$41/day from the INV-05 trips, plus $12/day from the western tree shading. SolarLink totals this live from your readings — you never have to guess.

Dispatch approval

You approve the fix and the amount — we never dispatch above your cap without asking again.

INV-05 — AC contactor replacement

Approved up to

$1,850

Pays back in

~45 days

Requested→Acknowledged in 15 min→Scheduled

Scheduled visit: Thu, Oct 15 · Morning (8–12)

Report archive

Monthly SolarLink Report — SeptemberOct 3Published
Annual review — Year 5Sep 1Published

Daily summaries, monthly SolarLink Reports and the annual review land here automatically — every report stays in the archive.

SolarLink pricing

$4.95 per kW DC per year — billed monthly.

One published price for the whole site's monitoring. Everything else is on call, à la carte — and here's what capturing more production looks like on your site.

As-needed contracts available for any service — no yearly commitment requiredO&M contracts available upon request, based on your open risk
$4.95per kW DC / year · billed monthly
What's included
  • Irradiance-based expected vs. actual monitoring
  • Live underperformance and overperformance alerts
  • Inverter- and string-level readings
  • Monthly SolarLink Report with dollar impact
  • Your first SolarLink Report is a Lifetime Performance Review of your site — every year since it was switched on, what it made, what it should have made, and what that gap cost
Examples
250 kW DC$1,237.50 /yr ≈ $103 /mo
1 MW DC$4,950 /yr ≈ $413 /mo
5 MW DC$24,750 /yr ≈ $2,063 /mo

What 5% more production looks like

For $4.95 per kW DC per year, here's what capturing 5% more production looks like.

5%
1%10%

At 5%, you gain $1.45 for every $1.

Change your site details

You pay

SolarLink, per year

$4,950

You gain

Added production value, per year

$7,200

Difference

Per year, after SolarLink's fee

+$2,250

$1.45 back for every $1

You pay
$4,950
You gain
$7,200

Per year, on a 1 MW site.

Example, not a guarantee — your Plan Review shows your real number.

Repairs are quoted per job and paid with or without SolarLink. Learn more

Included: Plan Review — free with your SolarLink signup

A full-scope review of your site — documents, build, red lines, AHJ and local regulations, depreciation and repair timing — ending in a maintenance plan that tells you what to fix and when. Every SolarLink site gets a full Plan Review at no extra cost — the plan is built from your inverter data.

See the Plan Review

Warranty claim evidence

Years of records showing inverter faults or panel degradation beyond the warranty allowance — documented proof, not estimates.

Better repair decisions

Recurring problems get a permanent fix; one-time events get a targeted repair. The history tells you which is which.

Due diligence ready

A year-by-year performance record of the asset — exactly what a buyer or lender asks for when selling or refinancing the site.

The clock is ticking on your profit

A problem you sit on bills you every single day.

Owners get a problem, sit on it, and try to figure out who's going to fix it and who's going to pay for it — while the meter keeps running. Per-day figures below use the sample site: 1 MW, $0.12/kWh, 1,200 kWh/kW/yr, 100 kW inverters.

One inverter down

$39.45

per day

Two inverters down

$78.90

per day

Site at 75%

$98.63

per day

Running at 75% for six months before anyone finds out = $18,000 gone.

On the sample 1 MW site — more than three years of SolarLink.

Set your dispatch trigger

You decide when it's worth a truck roll.

Example: two inverters down cost $78.90 a day — a $750 fix pays for itself in 9.5 days, so a 30-day trigger sends the crew. Safety issues always dispatch immediately.

Set your trigger

Know exactly what your system is doing.

SolarLink is $4.95 per kW DC per year, billed monthly — with on-call services when you need hands on the array.

Get SolarLink